Analysis of the standard reactor instrumentation signals following the German Nuclear Safety Standards Commission specification (KTA 3204) for the documentation of components of primary and secondary circuits of the pressurized water and boiling water reactors.

Instrumentation in use:

  • In- and out-core neutron flux
  • Thermocouples
  • Pressure transducer
  • Flow rate test points
  • Travel sensor and accelerometer

Analysed components:

  • Pressure vessel
  • Core barrel and core shroud
  • Fuel assemblies
  • Instrumentation lances
  • Circulating pumps
  • Shaft adjustments and sealings

Get your individual consultation!